Up To

Service

1,500 SqFt

2,500 SqFt

3,500 SqFt

4,500 SqFt

NC SOP Inspection

$430

$495

$565

$650

Crawlspace, add

$75

$90

$100

$110

Built prior to 2016, add

$45

$70

$105

$140

Built prior to 2006, add

$95

$120

$155

$190

Built prior to 1991, add

$160

$190

$215

$250

Built prior to 1976, add

$215

$250

$280

$320

Built prior to 1961, add

$275

$330

$400

$490

Built prior to 1946, add

$360

$420

$500

$605

Detached Buildings (up to 400 SqFt)

$185

Detached Garage (no HVAC/Plumbing)

$250

Detached Buildings w/living area

$345

Anything with plumbing or HVAC

Pre-drywall (pre insulation, all sizes)

$400

Two days before Builder's Pre-drywall Walk Through

----------Subcontracted Services ------------

Radon

$170

Termite

$115

Additional Fee for Detached Buildings

Septic (Gravity,Pump)

$490

Alternative Systems, Call for Quote

With Septic / Without

Well Inspection, Coliform Bacterial

$185/$315

Coliform Only (5 to 7 business days)

Well Inspection & Full Panel Water Testing

$260/$410

FHA/VA/HUD Coliform,Lead,Nitrate,Nitrite (12 to 14 business days)

Well Inspection & Level I Water Testing

$360/$510

Above Plus Antimony, Arsenic, Barium, Beryllium, Cadmium, Calcium, Chromium, Copper, Iron, Magnesium, Manganese, Mercury, Nickel. Selenium, Silver, Sodium, Thallium, Vanadium, Zinc, Hardness (12 to 14 business days)

Note: Additional a small fee will apply for distance traveled > 20 miles from company address 12512 Bayleaf Church Rd, Raleigh.